Fees
Address Assignments and Maintenance: No charge
Block Party Permit:
- No charge for the permit
- $25 Refundable Deposit for the use of Barricades
Dumpster Right-Of-Way Use Permit: $20 for each 30 days
Excavation Permits
- Excavation in the Right-Of-Way, not affecting sidewalk, drive approach or pavement: $45
- Sidewalk or Drive Approach: If any part of the excavation is in the sidewalk: $45 plus additional permit fee as necessary to replace the drive approach, sidewalk or curb, plus sidewalk closure fee, per day. See below.
- Street or Alley: If any part of the excavation is in the paved portion of street or alley: $45 for the first 15 square feet plus $3 for each additional square foot above 15 square feet, plus closure fee, per day.
In addition to the permit fee, excavations in the paved portion of the right-of-way are subject to a degradation fee to recover the cost of the degradation to the life of the pavement. The degradation fee is $7.50 per square yard of the "area of influence." The dimensions of the "area of influence" are the dimensions of the excavated opening, plus 2.5 feet on each side.
Lane/Sidewalk Closure Fee:
Kind of Sidewalk | Up to 7 days | For Each Day, 8 to 180 Days |
---|---|---|
Red Snow Routes (Primary Streets) | $100 | $130 per lane per day |
All other streets on Off Routes | $100 | $25 per lane per day |
Alleys | $50 | $10 per day |
Sidewalk | $30 | $30 per day |
Please note: Sidewalk fee waived if adjacent street closure is permitted for the same day.
Portable Storage Container Right-of-Way Use Permit: $20 for each 30 days
Note: Use of the parking lane alone, with no disruption of pedestrian or vehicular traffic, for reasons including but not limited to the storage of equipment, dumpsters or portable storage units, is subject to a $20 fee for each 30 days.
City Meter Hood Rentals: (Contact Heartland Parking at 674-1850)
- Daily: $8 per meter
- Monthly: $160 per meter
If the hood is lost, stolen or damaged, the Renter will be assessed a fee of $25 to $50.
Parking Lot Permits (Construction or Repair):
- 0 to 7,000 square feet: $20
- 7,001 to 30,000 square feet: $25
- 30,001 square feet and above: $30
Pavement Replacement Charge:
The following fees are only charged if the City crews perform the pavement restoration:
- Asphalt on concrete base or brick: $125 per square yard
- Asphalt on gravel or stone base: $75 per square feet
- Brick on concrete base (Madison Manor): $200 per square yard
- Brick on earth or sand: $140 per square yard
- Combination curb and gutter: $50 per lineal foot
- Concrete pavement: $150 per square yard
- Earth opening or inspection charge: $45 each
- Four-inch sidewalk: $6 per square foot
- Six-inch by 12-inch concrete curb: $40 per lineal foot
Permit Surcharge for Failure to Obtain a Permit Prior to the Start of Work:
- First Offense: Written Warning
- Second Offense: $1,000 in addition to required permit fees
- Each offense thereafter: Surcharge cumulatively increased by $1,000
Sidewalk and Drive Approach Permits (Commercial):
- Drive Approach (Each): $40
- Sidewalk:
- Under 50 square feet: no permit required
- Over 50 square feet and up to 70 lineal feet: $25
- 71 lineal feet and over: $0.35 per additional lineal foot
- Curb Only:
- Over 10 lineal feet: $25
Sidewalk and Drive Approach Permits (Residential):
- Sidewalk/Drive Approach constructed simultaneously:
- Over 50 square feet and up to 70 lineal feet: $40
- 71 lineal feet and over: $0.35 per additional lineal foot
- Sidewalk only:
- Under 50 square feet: no permit required
- Over 50 square feet and up to 70 lineal feet: $25
- 71 lineal feet and over: $0.35 per additional lineal foot
- Drive Approach only (Each): $20
- Curb only:
- Over 10 lineal feet: $25