- Home
- City Departments
- Public Works Department
- Bidding & Letting
- Bid Tabulations
Bid Tabulations
The following are summaries of the bid results for projects through the Public Works Department. The “Bid Opening Tracking Sheet” will be available following the official bid opening. This document lists each contractor and a total bid amount as read at the bid opening. The apparent low bidder may change once the detailed bid tabulation is calculated. The bid tabulation, including individual unit prices, will be made available after the contract is awarded.
2023 Projects
- Bid Tab - 2023 Downtown Wayfinding Signs
- Bid Tab - 2022 Nebraska Lighting
- Bid Tab - 2023 Abington Culvert Replacement
- Bid Tab - 2023 Culvert Replacement E Branch Dry Run Creek at W Merle Lane
- Bid Tab - 2023 Culvert Replacement Tributary C Under Glen Ave
- Bid Tab - 2023 HMA Overlay Nebraska
- Bid Tab - 2023 Slurry Seal
- Bid Tab - Big Hollow Bridge Rehabilitation
- Bid Tab - Combined Sewer Overflow Control Project Year 2
- Bid Tab - Riverfront Entrances
- Bid Tab 2023 Seal-coat
- Combined Sewer Overflow Control Project Year 2 Bid Tab
2022 Projects
- Bid Tab - CSO Year 1 (PDF)
- Bid Tab 2022 North Valley TIF Sidewalk Improvements (PDF)
- Bid Tab 2022 Seal-coat (PDF)
- Bid Tab 2022 Slurry Seal (PDF)
- Bid Tab Buckthorn Way (PDF)
- Bid Tab Glen Avenue Rehabilitation Project (PDF)
- Bid Tab Orange Prairie Road Improvements (PDF)
- Bid Tab Peoria Simantel Property (PDF)
- Bid Tab Sewer Cleaning, Televising, and Evaluation (PDF)
- Bid Tab Springdale Creek Streambank Stabilization Project (PDF)
- Bid Tab Villa Lake (PDF)
2021 Projects
- Bid Tab - Eugenie Avenue (PDF)
- Bid Tab - HMA Overlay (PDF)
- Bid Tab - Nebraska Avenue (PDF)
- Bid Tab - Northside Business Park TIF District 07.14.2021 (PDF)
- Bid Tab - Sidewalk Participation (PDF)
- Bid Tab - Slurry Seal 07.14.021 (PDF)
- Bid Tab - Warehouse Parking 04.21.201 (PDF)
- Bid Tab - Warehouse Parking Lots (PDF)
- Bid Tab Sidewalk Participation 2021 (PDF)
- Bid Tab Spring and Orchard (PDF)