Bid Tabulations
The following are summaries of the bid results for projects through the Public Works Department. The “Bid Opening Tracking Sheet” will be available following the official bid opening. This document lists each contractor and a total bid amount as read at the bid opening. The apparent low bidder may change once the detailed bid tabulation is calculated. The bid tabulation, including individual unit prices, will be made available after the contract is awarded.
- Bid Tab 2025 Pavement Preservation Seal-coat
- Combined Sewer Overflow Control Project Year 4 Bid Tab
- Concrete Repairs Bid Tab 2025
- Deerbrook Bid Tab_AKRF
- Evans Street Sidewalk Improvements Bid Tab
- Golden Acres Drainage Improvement Project 02315 Bid Tabulation
- Green Infrastructure Maintenance Bid Tab
- MacArthur - Bid Tab
- Moffatt Bid Tab
- Peoria 2024 Sidewalks Bid Tabulation
- QCT Bid Tab
- SS Repair Bid Tabulation
- Stormwater Outfall Repairs Bid Tab
- Wilhelm Channel Bid Tabulation
- 2024 Street Light Replacement - SW Adams Street
- Bid Tab Prospect Street Lighting 6-25-24
- Combined Sewer Overflow Control Project Year 3 Bid Tab
- Depot Street Bid Tab
- Drainage Improvements to Donald St from North Valley Ave to Machin Ave Bid Tabulation
- Glen Oak Bid Tabulation
- Lamont Ave Special Service Area Mill and Overlay Bid Tab
- MacArthur Hwy Reconstruction. Bid Tabulation
- MOSS AVE Bid Tab
- Nebraska Bid Tab 6-19-24
- Reservoir BID TAB 2024
- Ronald Rd Drainage Improvements Bid Tabulation
- Sidewalks and ADA Ramps 61605 Bid Tabs
- Wisconsin Ave McClure to Nebraska Bid Tab
2023 Projects
- Bid Tab - 2022 Nebraska Lighting
- Bid Tab - 2023 Abington Culvert Replacement
- Bid Tab - 2023 Culvert Replacement E Branch Dry Run Creek at W Merle Lane
- Bid Tab - 2023 Downtown Wayfinding Signs
- Bid Tab - 2023 Culvert Replacement Tributary C Under Glen Ave
- Bid Tab - 2023 Drainage Repair annual Contract 2024-2025
- Bid Tab - 2023 HMA Overlay Nebraska
- Bid Tab - 2023 Kickapoo Terrace
- Bid Tab - 2023 Slurry Seal
- Bid Tab - 2023 SS Clean and Inspection
- Bid Tab - 2023 SS Lining and Repairs
- Bid Tab - Big Hollow Bridge Rehabilitation
- Bid Tab - Combined Sewer Overflow Control Project Year 2
- Bid Tab - Riverfront Entrances
- Bid Tab 2023 Seal-coat
- Combined Sewer Overflow Control Project Year 2 Bid Tab
- NATIVE PLANTING-PATHS-ADA ENTRANCE Bid Tabs
- Nebraska Avenue Overlay Project 2023 Bid Tab
- Prospect_Arcadia Traffic Calming Bid Tab
- Sidewalk and ADA Bid Tabs
2022 Projects
- • Culvert Replacement Carrying the East Branch of Dry Run Creek Under MERLE LANE BID TAB
- 2022 DRAC Bid Tab Revised
- Abington Bid Tab
- Bid Tab - CSO Year 1 (PDF)
- Bid Tab 2022 Nebraska Lighting
- Bid Tab 2022 North Valley TIF Sidewalk Improvements (PDF)
- Bid Tab 2022 Seal-coat (PDF)
- Bid Tab 2022 Slurry Seal (PDF)
- Bid Tab Buckthorn Way (PDF)
- Bid Tab Glen Avenue Rehabilitation Project (PDF)
- Bid Tab Orange Prairie Road Improvements (PDF)
- Bid Tab Peoria Simantel Property (PDF)
- Bid Tab Sewer Cleaning, Televising, and Evaluation (PDF)
- Bid Tab Springdale Creek Streambank Stabilization Project (PDF)
- Bid Tab Villa Lake (PDF)
- McClure North Bid Tabulation
- Nebraska Ave Lighting - Knoxville to Wisconsin
- Propsect Road Mill and Overlay Tabulation of Bids
2021 Projects
- Bid Tab - Eugenie Avenue (PDF)
- Bid Tab - HMA Overlay (PDF)
- Bid Tab - Nebraska Avenue (PDF)
- Bid Tab - Northside Business Park TIF District 07.14.2021 (PDF)
- Bid Tab - Sidewalk Participation (PDF)
- Bid Tab - Slurry Seal 07.14.021 (PDF)
- Bid Tab - Warehouse Parking 04.21.201 (PDF)
- Bid Tab - Warehouse Parking Lots (PDF)
- Bid Tab Sidewalk Participation 2021 (PDF)
- Bid Tab Spring and Orchard (PDF)